[Case of Machinery Equipment Repair] Water Pipe Connection Work
Take measures to prevent water leakage during cutting! Connect the PVC piping and the white piping using flanges.
The customer was planning to introduce new equipment in the factory to respond to increased production, and was considering measures to establish a system that could handle any troubles that might arise. Their request was, "Currently, we are using separate pipes, and we want to connect them into one so that even if one stops, we can supply water from the other pipe, allowing us to keep the equipment running." To connect the respective pipes, we used flanges to connect the PVC and white pipes at the junction points. Additionally, considering future applications, we installed ball valves to ensure that each pipe could be used independently, and carried out the work to consolidate the piping. 【Case Overview】 ■ Industry: Electronic Components Manufacturing ■ Subject: Piping ■ Request: Piping Construction ■ Construction Details: 1 day (1 week after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
- Company:酒重
- Price:Other